login form

forgot password?

don't have an account create one!

phone number

+

+

email address

@gmail.com

@gmail.com

office address

design

* DETAIL DRAWING FOR CONSTRUCTION OF 301.30M LONG PSC GIRDER BRIDGE.


* DETAIL DRAWING FOR CONSTRUCTION OF 39.0M LONG RELIFE BRIDGE.


* SPUR FOR RIVER TRAINING WORKS DETAIL DRAWING.


* DETAIL DRAWING APPROACH ROAD AND BOX CULVERT.


report

* POST TENSIONING REPORT SPAN 1 GIRDER 2.


* POST TENSIONING REPORT SPAN 1 GIRDER 1.


* POST TENSIONING REPORT SPAN 2 GIRDER 4.


* POST TENSIONING REPORT SPAN 2 GIRDER 3.


* POST TENSIONING REPORT SPAN 2 GIRDER 2.


* POST TENSIONING REPORT SPAN 2 GIRDER 1.


* SAND REPORT.


* STONE CHIPS REPORT 01.


* STONE CHIPS REPORT 02.


* DEFORMED BAR REPORT 400w.


* DEFORMED BAR REPORT 500w.


* WIRE PRI STRESSING TEST RESULTS.


* BEARING PAD TEST RESULTS.


* 39M RELIEF BRIDGE SOIL TEST RESULTS.


Others

* Tour Letter 276-2026 8/03/2026.


* Land Acquisition Gilabari.


* Calibration of Pressure Gauge 23/10/2025.


* Calibration of Pressure Gauge 07/10/2025.


* Tour Letter 1052-2025 15/10/2025.


* Bar Chart 301.30m PSC Girder.


* Calibration of Pressure Gauge 25/06/2025.


* Concrete Mix Design 18/06/2025.


* Concrete Mix Design 30/01/2025.


* Matco Single strip expansion joint papers.


* POST TENSIONING REPORT FORM.


* SITE VISIT TABLE FORM.