301m
Bridge
home
about
activities
map
gallery
document
contact
login form
remember me
forgot password?
don't have an account
create one!
phone number
+
+
email address
@gmail.com
@gmail.com
office address
design
* DETAIL DRAWING FOR CONSTRUCTION OF 301.30M LONG PSC GIRDER BRIDGE.
* DETAIL DRAWING FOR CONSTRUCTION OF 39.0M LONG RELIFE BRIDGE.
* SPUR FOR RIVER TRAINING WORKS DETAIL DRAWING.
* DETAIL DRAWING APPROACH ROAD AND BOX CULVERT.
report
* POST TENSIONING REPORT SPAN 1 GIRDER 2.
* POST TENSIONING REPORT SPAN 1 GIRDER 1.
* POST TENSIONING REPORT SPAN 2 GIRDER 4.
* POST TENSIONING REPORT SPAN 2 GIRDER 3.
* POST TENSIONING REPORT SPAN 2 GIRDER 2.
* POST TENSIONING REPORT SPAN 2 GIRDER 1.
* SAND REPORT.
* STONE CHIPS REPORT 01.
* STONE CHIPS REPORT 02.
* DEFORMED BAR REPORT 400w.
* DEFORMED BAR REPORT 500w.
* WIRE PRI STRESSING TEST RESULTS.
* BEARING PAD TEST RESULTS.
* 39M RELIEF BRIDGE SOIL TEST RESULTS.
Others
* Tour Letter 276-2026 8/03/2026.
* Land Acquisition Gilabari.
* Calibration of Pressure Gauge 23/10/2025.
* Calibration of Pressure Gauge 07/10/2025.
* Tour Letter 1052-2025 15/10/2025.
* Bar Chart 301.30m PSC Girder.
* Calibration of Pressure Gauge 25/06/2025.
* Concrete Mix Design 18/06/2025.
* Concrete Mix Design 30/01/2025.
* Matco Single strip expansion joint papers.
* POST TENSIONING REPORT FORM.
* SITE VISIT TABLE FORM.
Design by
MapBD